A SIMULATION-BASED FRAMEWORK FOR AS-BUILT DOCUMENTATION OF CONSTRUCTION PROCESS AND PRODUCT INFORMATION Open Access

Descriptions

Other title
Subject/Keyword
Simulation Modeling
Distributed Simulation
As-built Documentation
Construction Simulation
Construction Process
Type of item
Thesis
Degree grantor
University of Alberta
Author or creator
Moghani, Elmira
Supervisor and department
AbouRizk, Simaan M. (Civil and Environmental Engineering)
Examining committee member and department
Robinson Fayek, Aminah (Civil & Environmental Engineering)
Al-Hussein, Mohamed (Civil & Environmental Engineering)
Lipsett, Michael (Mechanical Engineering)
Bayat, Alireza (Civil & Environmental Engineering)
AbouRizk, Simaan M. (Civil & Environmental Engineering)
Lucko, Gunnar (Civil Engineering, Catholic University of America)
Department
Department of Civil and Environmental Engineering
Specialization
Construction Engineering and Management
Date accepted
2013-01-30T11:51:18Z
Graduation date
2013-06
Degree

Degree level
Doctoral
Abstract
In the construction industry, project documentation that covers all aspects of a project from planning through construction to the completion phase not only plays a significant role in managing an ongoing project, but is also considered a main resource in claim and dispute resolution, and in the planning of future projects. Therefore, project managers are always looking for efficient methods to document project information. Various software applications have been developed to assist project managers in data collection, storage, and retrieval including all aspects from drawings to cost estimates, schedules, resource information, change orders, and work logs. Studying existing commercial applications and research developments reveals that these systems, which mainly capture and integrate project information through database systems, CAD models, or scheduling software, focus on the static information of a project, thus losing the dynamic aspects of project progress including project work flow, resource interaction, and effects of external factors in an integrated format. Therefore, the main objective of this research is the development of a generic framework for information representation that incorporates process model, product model, and external factors of a project into one system to create a complete project chronology, including all changes to the original plan. The system integrates the information and presents it to the user in a dynamic format, providing an overview of the project at every stage for comparison with the project as planned. This framework will help project managers to control the project during the execution phase while compiling a history of the project for future use. The proposed framework utilizes computer simulation’s functionality in modeling the dynamic nature of a project. This application employs a distributed simulation concept based on the High Level Architecture (HLA) rules in a Construction Synthetic Environment (COSYE) to facilitate integration of simulation components, to promote interoperability between the components, and to aid reusability of models in the future. This research uses a case study that focuses on repetitive construction such as tunnelling, which lends itself better to simulation planning. The proposed framework is created based on existing tunnel projects and is validated with an ongoing tunnelling case study.
Language
English
DOI
doi:10.7939/R3TS54
Rights
Permission is hereby granted to the University of Alberta Libraries to reproduce single copies of this thesis and to lend or sell such copies for private, scholarly or scientific research purposes only. Where the thesis is converted to, or otherwise made available in digital form, the University of Alberta will advise potential users of the thesis of these terms. The author reserves all other publication and other rights in association with the copyright in the thesis and, except as herein before provided, neither the thesis nor any substantial portion thereof may be printed or otherwise reproduced in any material form whatsoever without the author's prior written permission.
Citation for previous publication

File Details

Date Uploaded
Date Modified
2014-04-24T23:02:37.449+00:00
Audit Status
Audits have not yet been run on this file.
Characterization
File format: pdf (Portable Document Format)
Mime type: application/pdf
File size: 9483049
Last modified: 2015:10:18 01:40:56-06:00
Filename: Moghani_Elmira_Spring 2013.pdf
Original checksum: 958ed72a92d5eb0e21985306ba7e7312
Well formed: true
Valid: false
Status message: Invalid page tree node offset=19242
Status message: Invalid outline dictionary item offset=9378216
Activity of users you follow
User Activity Date