ERA

Download the full-sized PDF of Factors to Consider in Estimating Oil Sands Plant Decommissioning CostsDownload the full-sized PDF

Analytics

Share

Permanent link (DOI): https://doi.org/10.7939/R3NK36876

Download

Export to: EndNote  |  Zotero  |  Mendeley

Communities

This file is in the following communities:

Oil Sands Research and Information Network (OSRIN)

Collections

This file is in the following collections:

OSRIN Technical Reports

Factors to Consider in Estimating Oil Sands Plant Decommissioning Costs Open Access

Descriptions

Author or creator
Morton Sr., M.
Mullick, A.
Nelson, J.
Thornton, W.
Additional contributors
Subject/Keyword
MFSP
Oilsands
OSRIN
TR-16
Decommissioning
Alberta
Costs
Tar Sands
Oil Sands
Plant Site
Tarsands
Methodology
Remediation
Type of item
Report
Language
English
Place
Canada, Alberta, Fort McMurray
Time
Description
This report provides a number of cost estimating factors, common terminology and common practices derived from industrial decommissioning projects, international cost estimating practices and the outcome of a joint university, industry and regulator workshop. The cost estimation factors identified in this report represent common practice in the decommissioning industry and are intended to cover the key cost components for a detailed oil sands plant decommissioning cost estimate. This report also identifies factors that may affect the reliability of the estimates (i.e., the level of uncertainty and therefore an indication of the contingency factors that may need to be applied to the estimate). Significant factors contributing to a detailed oil sands facility Mine Financial Security Program (MFSP) Liability project cost estimates include: • Scope Definition • Assumptions • Basis of Estimate • Site Environmental Assessment(s)/Physical Plant/Residual Materials/Hazards • Shutdown/Isolation/Hazards Removal • Demolition/Dismantling/Salvage/Recycle • Remediation/Decontamination • Risk Analysis • Long Term Monitoring • Liability Estimate Revisions The intent of this document is to supplement the existing guidance on the content of the MFSP Liability value that is in the Guide to the Mine Financial Security Program. The report does not prescribe what needs to be included at any point in the Approval Holder’s MFSP estimate. Included in the report are the things one should consider at some point in the life cycle of the oil sands plant (especially close to the time the Operating Life Deposit is made) and some information on the methodology and accuracy of estimates. Similarly, the intent is not to prescribe when the Approval Holder chooses to include increased detail or accuracy to the estimates – this is the Approval Holder’s decision. The report does offer suggestions (e.g., estimate methods, content, and when and why the accuracy of the estimate might be updated, etc.) to assist in developing an estimate.
Date created
2011/12/07
DOI
doi:10.7939/R3NK36876
License information
Creative Commons Attribution 3.0 Unported
Rights

Citation for previous publication

Source
Link to related item

File Details

Date Uploaded
Date Modified
2014-04-29T17:21:39.167+00:00
Audit Status
Audits have not yet been run on this file.
Characterization
File format: pdf (Portable Document Format)
Mime type: application/pdf
File size: 881546
Last modified: 2015:10:12 19:22:04-06:00
Filename: TR-16 - Decommissioning Report.pdf
Original checksum: 47fea855d6d561c02f48bc4aaa5b0187
Well formed: true
Valid: true
File author: Chris Powter
Page count: 63
File language: en-US
Activity of users you follow
User Activity Date