ERA

Download the full-sized PDF of Summary report on Athabasca River power development Crooked Rapids site studyDownload the full-sized PDF

Analytics

Share

Permanent link (DOI): https://doi.org/10.7939/R3XW47W84

Download

Export to: EndNote  |  Zotero  |  Mendeley

Communities

This file is in the following communities:

Oil Sands Research and Information Network (OSRIN)

Collections

This file is in the following collections:

Government of Alberta Reports

Summary report on Athabasca River power development Crooked Rapids site study Open Access

Descriptions

Author or creator
Mussavind, T. V.
Additional contributors
Subject/Keyword
Athabasca River
Planning
Ice
Economics
Alberta
Hydropower
Dam
Hydrology
Type of item
Report
Language
English
Place
Time
Description

Date created
1975
DOI
doi:10.7939/R3XW47W84
License information
Rights
This material is provided under educational reproduction permissions included in Alberta Environment and Sustainable Resource Development's Copyright and Disclosure Statement, see terms at http://www.environment.alberta.ca/copyright.html. This Statement requires the following identification: \"The source of the materials is Alberta Environment and Sustainable Resource Development http://www.environment.gov.ab.ca/. The use of these materials by the end user is done without any affiliation with or endorsement by the Government of Alberta. Reliance upon the end user's use of these materials is at the risk of the end user.
Citation for previous publication
In December, 1973, the Environmental Planning Division of the Department of the Environment invited proposals for preliminary studies associated with a proposed dam on the Athabasca River in the vicinity of Crooked Rapids. This study was carried out in co-operation with the Energy Resources Conservation Board and under the direction of B.C. Doell study co-ordinator. In March, 1974, the study was awarded to Thurber Consultants Ltd. who had submitted a joint proposal with Crippen Engineering Ltd. and Northwest Hydraulic Consultants Ltd. The Consultants' report was submitted in two volumes in early February, 1975. This is a summary of the Consultant’s findings. It should be noted, however, that owing to the complicated conditions at Crooked Rapids, a summary of reasonable length cannot cover all aspects of the situation. Consequently, Volume 1 of the Consultant’s report must also be read before a full appreciation of the various problems can be obtained. The Consultants were requested to carry out preliminary studies to determine the technical feasibility and estimated cost of constructing a dam in the vicinity of Crooked Rapids. The study was to encompass all engineering considerations of alternate dam alignments and heights, and was to include such items as site inspection, site mapping, hydrological and geological investigations, borrow investigation, shoreline stability problems, ice and sedimentation problems, predictable upstream and downstream effects, hydro power generation potential and potential for flood control. It was considered that the technical feasibility of constructing a dam at Crooked Rapids should be established prior to carrying out a detailed environmental assessment. Therefore this did not constitute part of the consultants assignment. The study was to assume that any dam which might be constructed at Crooked Rapids would be the first development on the rover. Consequently, the project as proposed and studies did not have the benefit of any upstream storage.
Source
Link to related item

File Details

Date Uploaded
Date Modified
2014-04-30T22:30:02.501+00:00
Audit Status
Audits have not yet been run on this file.
Characterization
File format: pdf (PDF/X)
Mime type: application/pdf
File size: 7486356
Last modified: 2015:10:12 20:26:29-06:00
Filename: 1975 - Mussivand - Crooked Rapids Study.pdf
Original checksum: d1230f4be900a514c962f8904dcf9c0f
Activity of users you follow
User Activity Date