ERA

No preview available

Analytics

Share

Permanent link (DOI): https://doi.org/10.7939/R38C9R44C

Download

Export to: EndNote  |  Zotero  |  Mendeley

Communities

This file is in the following communities:

Oil Sands Research and Information Network (OSRIN)

Collections

This file is in the following collections:

Environmental Impact Assessment Reports

Syncrude Lease 17 (Mildred Lake) Open Access

Descriptions

Author or creator
Syncrude Canada Ltd.
Additional contributors
Subject/Keyword
2 - Attached 2 - Volume 3 - Baseline Information
1 - Attached 1 - Volume 2 - Development Alternatives
Alberta
3 - Attached 3 - Volume 4 - Supporting Studies
0 - Download - Volume 1 - Overview
Type of item
Report
Language
English
Place
Canada, Alberta, Fort McMurray
Time
Description
Syncrude Canada Limited and the Government of the Province of Alberta are currently negotiating the practicability of proceeding with a synthetic crude oil production project. During the course of analyzing the practicability of the project, the need for an environmental impact assessment was clearly revealed. Three major time frames - during the planning stage, during construction, and during the commercial operation of the plant - have been accepted as appropriate for reporting environmental impact assessments. This Environmental Impact Assessment has therefore been prepared by Syncrude Canada Limited, for submission to the Department of the Environment prior to the start of construction of its project. The proposed Syncrude commercial operation will be carried out on Lease 17, which lies 20 miles north of the town of Fort McMurray and borders on Lease 86, the site of the only existing tar sands operation. Lease 17 covers 49,788 acres and contains potentially mineable bitumen reserves of approximately 3.5 billion barrels. For mine planning, Lease 17 has been divided into several areas. The site of the initial operation hereafter will be referred to as the initial mining area. It contains enough reserves to feed the proposed plant for approximately 14 years at its approved rate of 80,000 BPD of synthetic products. When the other reserves indicated in Figure 1 are included, the life of this portion of the deposit is about 70 years.
Date created
1973
DOI
doi:10.7939/R38C9R44C
License information
Rights
This material is provided under educational reproduction permissions included in Alberta Environment and Sustainable Resource Development's Copyright and Disclosure Statement, see terms at http://www.environment.alberta.ca/copyright.html. This Statement requires the following identification: \"The source of the materials is Alberta Environment and Sustainable Resource Development http://www.environment.gov.ab.ca/. The use of these materials by the end user is done without any affiliation with or endorsement by the Government of Alberta. Reliance upon the end user's use of these materials is at the risk of the end user.
Citation for previous publication

Source
Link to related item

File Details

Date Uploaded
Date Modified
2014-08-13T14:25:00.893+00:00
Audit Status
Audits have not yet been run on this file.
Characterization
File format: zip (ZIP Format)
Mime type: application/zip
File size: 65401943
Last modified: 2015:10:12 19:58:00-06:00
Filename: uuid:5ff705d9-3d88-46db-9f44-21507dcdff10.zip
Original checksum: b61514fa75fcf07396a2926bd2b328f4
Activity of users you follow
User Activity Date