ERA

Download the full-sized PDF of Athabasca River modelling studies (phase I): Fort McMurray - EmbarrasDownload the full-sized PDF

Analytics

Share

Permanent link (DOI): https://doi.org/10.7939/R3FX73Z4K

Download

Export to: EndNote  |  Zotero  |  Mendeley

Communities

This file is in the following communities:

Oil Sands Research and Information Network (OSRIN)

Collections

This file is in the following collections:

AOSERP Reports

Athabasca River modelling studies (phase I): Fort McMurray - Embarras Open Access

Descriptions

Author or creator
Yau, H.
Murphy, K. L.
Timpany, P. L.
Additional contributors
Subject/Keyword
Tar Sands
Modeling
Oilsands
Oil Sands
Alberta
AOSERP
Water Chemistry
Salinity
Tarsands
Water Quality
Athabasca River
AOSERP L-76
Type of item
Report
Language
English
Place
Canada, Alberta, Fort McMurray
Time
Description
The present and proposed industrial development associated with the Athabasca Oil Sands has resulted in a need to evaluate the Athabasca River transport and assimilation of contaminants and water occurring substances. Since the beginning of AOSERP in April 1975, water quality and quantity data have been collected to provide a general baseline of information. Preliminary studies of the Athabasca River Basin indicate that a mass balance approach may be used to model the chemistry of the Athabasca River. The base model developed provides a reasonable analysis of dissolved sodium, dissolved chloride, total alkalinity, and total hardness between Fort McMurray and the Embarras Airport. It appears possible now to investigate transformations, impacts, and assimilation of non-conservative substances in the Athabasca River utilizing the mass balance concept developed for conservative substances in the study. Once the composite model is calibrated and tested, it would predict mass loading or concentration of a parameter at any point along the study area for different future development scenarios. The resulting evaluations of these development scenarios will allow comprehensive management planning to be completed for the Athabasca watershed.
Date created
1982
DOI
doi:10.7939/R3FX73Z4K
License information
Rights
This material is provided under educational reproduction permissions included in Alberta Environment and Sustainable Resource Development's Copyright and Disclosure Statement, see terms at http://www.environment.alberta.ca/copyright.html. This Statement requires the following identification: \"The source of the materials is Alberta Environment and Sustainable Resource Development http://www.environment.gov.ab.ca/. The use of these materials by the end user is done without any affiliation with or endorsement by the Government of Alberta. Reliance upon the end user's use of these materials is at the risk of the end user.
Citation for previous publication

Source
Link to related item

File Details

Date Uploaded
Date Modified
2014-12-05T12:41:34.045+00:00
Audit Status
Audits have not yet been run on this file.
Characterization
File format: pdf (Portable Document Format)
Mime type: application/pdf
File size: 3029814
Last modified: 2015:10:12 19:33:34-06:00
Filename: AOSERP L-76.pdf
Original checksum: 7c31300538423253228271309a1758cc
Well formed: true
Valid: false
Status message: Invalid page tree node offset=12966
Status message: Outlines contain recursive references.
File title: AOSERP L-76.pdf
Activity of users you follow
User Activity Date