Preliminary compatibility studies of G.C.O.S. sand tailings pond water with Athabasca River Open Access

Descriptions

Author or creator
Alberta Health, Environmental Health Services Division
Additional contributors
Subject/Keyword
Athabasca River
Alberta
Suncor
Tailings
Tarsands
Tar Sands
Oil Sands
Oilsands
Type of item
Report
Language
English
Place
Canada, Alberta, Fort McMurray
Time
Description
On May 30, 1968 G.C.O.S requested permission to discharge 110 x 106 ft3 of effluent from the sands tailings pond at the Fort McMurray site into the Athabasca River during periods of high river flow. G.C.O.S. outlined the events which made this request necessary in order that an adequate base be developed for a stable 200 foot dike. Samples of the tailings pond water were obtained on June 3, 1968 to assess it’s compatibility with the river water. Samples of the A.P.I. separator retention pond effluent, waste water storage pond, and Lake Athabasca were also obtained. Analytical data suggest that a discharge of 10 x 106 I .G.P.D. from the Tailings Pond would minimize effects on the Athabasca River and yet allow the discharge of 110 x 106 ft3 to occur during a 2 month period when river flows exceed 20,000 c.f.s. Sedimentation of the high solids content could be induced by directing the Tailings Pond water to the retention ponds prior to discharge from the waste water storage pond. Assuming that the regular process waste water discharge is maintained at 10 x 106 I.G.P.D., settling time of the Tailings Pond water (10 x 106 l.G.P.D.) would be 7 hours in the retention ponds and 8.4 days in the waste water storage pond.
Date created
1968
DOI
doi:10.7939/R3V40K03G
License information
Rights
The source of the material is Alberta Health http://www.health.gov.ab.ca. The use of this material by the end user is done without any affiliation with or endorsement by the Government of Alberta. This material is provided solely for the user's information and is provided strictly \"as is\" without warranty of any kind. Users should exercise due diligence in ensuring the accuracy of the materials. Reliance upon this material is at the risk of the user. The Government of Alberta, its agents, employees or contractors will not be liable for any damages arising out of a person's use of the information contained in this material.
Citation for previous publication

Source
Link to related item

File Details

Date Uploaded
Date Modified
2014-05-01T03:13:13.863+00:00
Audit Status
Audits have not yet been run on this file.
Characterization
File format: pdf (PDF/X)
Mime type: application/pdf
File size: 3630913
Last modified: 2015:10:12 18:36:05-06:00
Filename: 1968 - Preliminary-Compatibility-Studies-of-GCOS-Sand-Tailings-Pond-Water-with-Athabasca-River.pdf
Original checksum: fcf446f3ee8b04cfa8cc4c5c76c25cde
Activity of users you follow
User Activity Date